Heat-recovery modules for industrial steam and hot-water boilers, fired on LPG, natural gas, diesel or HFO. Figures below are the design envelope; the measured performance on a specific plant is published on its own PULSE page.
VX- codes are Heattech selection codes, not Cain SKU numbers. Cain sizes each unit per project RFQ; we order by the duty in kW and confirm the final size from measured flue-gas data.
| Code CXL | Code DXL | Duty (kW) | Boiler (t/h steam) | LPG (kg/h) | Flue gas (kg/h) | Sensible (kW) | Latent (kW) |
|---|---|---|---|---|---|---|---|
| VX-CXL-0100 | VX-DXL-0100 | 100 | 1.3 | 72 | 1.326 | 52 | 48 |
| VX-CXL-0200 | VX-DXL-0200 | 200 | 2.5 | 143 | 2.652 | 104 | 96 |
| VX-CXL-0300 | VX-DXL-0300 | 300 | 3.8 | 215 | 3.977 | 157 | 143 |
| VX-CXL-0400 | VX-DXL-0400 | 400 | 5.1 | 287 | 5.303 | 209 | 191 |
| VX-CXL-0500 | VX-DXL-0500 | 500 | 6.3 | 358 | 6.629 | 261 | 239 |
| VX-CXL-0600 | VX-DXL-0600 | 600 | 7.6 | 430 | 7.955 | 313 | 287 |
| VX-CXL-0700 | VX-DXL-0700 | 700 | 8.9 | 502 | 9.281 | 365 | 335 |
| VX-CXL-0800 | VX-DXL-0800 | 800 | 10.2 | 573 | 10.606 | 418 | 382 |
| VX-CXL-0900 | VX-DXL-0900 | 900 | 11.4 | 645 | 11.932 | 470 | 430 |
| VX-CXL-1000 | VX-DXL-1000 | 1000 | 12.7 | 717 | 13.258 | 522 | 478 |
| VX-CXL-1100 | VX-DXL-1100 | 1100 | 14.0 | 788 | 14.584 | 574 | 526 |
| VX-CXL-1200 | VX-DXL-1200 | 1200 | 15.2 | 860 | 15.910 | 626 | 574 |
| VX-CXL-1300 | VX-DXL-1300 | 1300 | 16.5 | 932 | 17.236 | 679 | 621 |
| VX-CXL-1400 | VX-DXL-1400 | 1400 | 17.8 | 1003 | 18.561 | 731 | 669 |
| VX-CXL-1500 | VX-DXL-1500 | 1500 | 19.0 | 1075 | 19.887 | 783 | 717 |
| VX-CXL-1600 | VX-DXL-1600 | 1600 | 20.3 | 1147 | 21.213 | 835 | 765 |
nnnn is the duty in kW, zero-padded to four digits (0700 = 700 kW). Both codes exist at the same duty: CXL = single stage, DXL = two stage. Range 100 – 1600 kW (1.3 – 20.3 t/h steam).
VX-CXL-0700 = 700 kW, fits a ~8.9 t/h steam boiler at the assumptions below. CXL if the plant has steady makeup/process water; DXL if makeup is limited or intermittent.
At these assumptions the theoretical ceiling is 10.9 % of fuel input (all sensible and latent heat recovered). The 8.47 % we publish is the figure measured on our demo plant — a different number, on purpose. Do not mix the two: the ceiling is a calculation, 8.47 % is a measurement.
Equipment and installation are quoted per site, against the saving measured on that site. PULSE subscription is priced per boiler per month — see pricing. No price is published for hardware because a stack that fits a 6 MW boiler does not fit a 1.5 MW one.


Both configurations cool the flue gas to the same 77–49 °C (170–120 °F), below the water dew point — that match is the design target, not a coincidence. What differs is where the heat goes and how many hours a year the exchanger actually runs condensing.
How to choose: steady makeup or process water plus a tight budget points to CXL; limited or uneven makeup water, or the largest possible total heat recovery, points to DXL. Neither is absolutely better — the plant’s real heat sinks decide. Sizing is done on measured water flows, flue-gas flow and stack temperature, not on a brochure.