1. Scope and boundary
The boundary is the boiler house: fuel meter(s), feedwater, steam output, flue gas, condensate. Heat recovery is
inside the boundary; the burner and its controls are untouched. Savings are attributed to the retrofit only —
production changes are corrected for, not credited to us.
2. Baseline
- Source: 12 consecutive months of fuel invoices and steam-output records, supplied by the client.
- Normalisation: fuel per tonne of steam (kg/t), which removes production volume from the comparison.
- Reference price: the client's own fuel price, fixed at contract signature and reviewed annually.
For the demo plant: 30k VND/kg (Vietnam) and $1/kg (USA).
- Weather: boiler houses are not weather-normalised; where a plant's load is seasonal, the baseline is
split into load bands instead.
3. Measurement after retrofit
Fuel
Mass flow meter at the burner train, 1-minute samples, 1-minute rollups.
Steam
Existing flow meter, cross-checked against feedwater.
Recovered heat (Q)
Feedwater ΔT × flow — the primary leg.
Flue gas
Inlet and outlet thermocouples — the independent cross-check.
Condensate
Drain-line flow meter, weighed basis, used for the latent share.
Sampling
1-minute samples; hourly and daily rollups; raw rows retained.
4. Calculation
Fuel saving (%) = 1 − (fuel per tonne of steam after ÷ baseline) — computed per day, then rolled up.
Money saved = fuel not purchased × reference price + water recovered × water price.
Latent share = Q_latent ÷ Q_total, where Q_latent = condensate kg/h × 2,257 kJ/kg ÷ 3600.
above-dew-point and latent legs are always split in proportion to measured energy, never by assumption.
5. Corrections and exclusions
- Days with meter outage are excluded, not interpolated, and flagged in the report.
- Boiler trips, commissioning days and fuel changes are annotated; the saving is reported with and without them.
- No saving is booked where the two legs (feedwater and flue gas) disagree by more than 8 %.
6. Uncertainty
Stated per report, not hidden in a footnote: instrument class, calibration date, sample coverage (%) and the
resulting band on the monthly figure. A saving is quoted as a band whenever the band is wider than ±5 %.
7. Reporting and access
- Daily and monthly report generated from the same database the dashboard reads.
- Client owns the data; export (CSV) available at any time; PULSE can be terminated without losing history.
- Reports carry the calculation inputs, so a third party can reproduce the number.
8. Dispute path
Any month can be re-opened within 60 days. Both sides re-derive from raw rows; if the disagreement stands, an
independent metering engineer is appointed and the disputed month is excluded from billing until resolved.