How a saving becomes a number both sides accept. Written so that a third-party engineer can re-derive every figure from the plant's own meters.

1. Scope and boundary

The boundary is the boiler house: fuel meter(s), feedwater, steam output, flue gas, condensate. Heat recovery is inside the boundary; the burner and its controls are untouched. Savings are attributed to the retrofit only — production changes are corrected for, not credited to us.

2. Baseline

3. Measurement after retrofit

Fuel
Mass flow meter at the burner train, 1-minute samples, 1-minute rollups.
Steam
Existing flow meter, cross-checked against feedwater.
Recovered heat (Q)
Feedwater ΔT × flow — the primary leg.
Flue gas
Inlet and outlet thermocouples — the independent cross-check.
Condensate
Drain-line flow meter, weighed basis, used for the latent share.
Sampling
1-minute samples; hourly and daily rollups; raw rows retained.

4. Calculation

Fuel saving (%) = 1 − (fuel per tonne of steam after ÷ baseline) — computed per day, then rolled up. Money saved = fuel not purchased × reference price + water recovered × water price. Latent share = Q_latent ÷ Q_total, where Q_latent = condensate kg/h × 2,257 kJ/kg ÷ 3600. above-dew-point and latent legs are always split in proportion to measured energy, never by assumption.

5. Corrections and exclusions

6. Uncertainty

Stated per report, not hidden in a footnote: instrument class, calibration date, sample coverage (%) and the resulting band on the monthly figure. A saving is quoted as a band whenever the band is wider than ±5 %.

7. Reporting and access

8. Dispute path

Any month can be re-opened within 60 days. Both sides re-derive from raw rows; if the disagreement stands, an independent metering engineer is appointed and the disputed month is excluded from billing until resolved.